PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed storm piping up to the 2nd floor Facing North.jpg Installing metal framing around the arch at the 2nd floor Facing North.jpg Started the bathroom roughing at the 2nd floor Facing South.jpg Welded clips along the column at the 3rd floor North Elevation.jpg Welded clips at the 3rd floor West Elevation.jpg
Previous page Welded clips at the 3rd floor West Elevation
Welded clips at the 3rd floor West Elevation